Power shut down in Jammu for maintenance work

Power supply to remain affected in Jammu

In order to carry out the works by M/s IRCON International Limited under Cluster-II, R-APDRP Part-B, the shutdown of 33 KV lines feeding power to various Sub-Stations is allowed.

During the power shut down, the power supply to Gole Gujaral, Sunder Nagar, Jaswant Palaza,  Munshi Chak, Ajit Colony, Amar Colony and adjoining areas shall remain affected from 8.30 am to 7.30 pm on December 20, 2015.

          Similarly the power supply to Prem Nagar, Lower Prem Nagar, Qasim Nagar, Christian Colony, part of Raghunath Bazar and adjoining areas shall remain affected from 9 am to 5 pm on December 23, 2015.

          Meanwhile, in order to carry out the development works by M/s IRCON under R-APDRP works, 11 KV Feeder N-2, & N-8 emanating from 33/11 KVA R/Stn Nanak Nagar shall remain under shut down on f December 19,  2015 from 11 am to 1 pm.

          During the power shut down, the power supply to Gandhi Nagar, Shastri Nagar, Nanak Nagar PHE Station Nanak Nagar, Gandhi Nagar, Shastri Nagar, Preet Nagar, Narwal Pain and its adjoining areas.